Polyester Spiral Pressure Filter, sludge dewatering network, polyester power plant desulfurization network installation instructions
Instructions for use:
1. Before the Internet, the machine is calibrated, and the rollers are flexible to rotate, and no dirt is allowed. Put the net into the workshop one week in advance to adapt to temperature changes.
2. Avoid contact with sharp edges and corners when surfing the Internet. It is strictly forbidden to smoke and open fire near the net. Strictly follow the grid line to access the Internet, prohibiting the reverse. The network ports should be aligned, and the threading is forbidden to be lapped from both ends.
3. The use temperature of the net shall not exceed 150 °C. Before each operation, the mesh surface shall not be contaminated with impurities. The net needs to be infiltrated with water before running. Dry grinding is strictly prohibited. Rinse with water after shutdown to prepare for the next boot.
4. The initial running tension should not be too large. After the operation is stable, add tension to feed. Due to the characteristics of the polyester mesh, there are physical changes in the initial operation, which can be adjusted according to the actual situation.
5. Storage conditions of the net: the temperature is about 20 °C, and the relative humidity is about 50%. Due to the different temperature and humidity in each area, try to use the network first.
6, net cleaning: pay attention to the scientific use of cleaning agents, chemical cleaning must use neutral or 5% cold alkali solution with a soft brush to scrub, and then immediately rinse with water.
7. If there is any quality problem during the user's use, please contact the factory after sales.